The rooftop solar project
We are in the process of securing grant funding for, designing, and installing a seven-figure, 300+ kW rooftop solar system on our mixing facility. Sized against actual consumption, it will generate in excess of 100 percent of that building's annual electricity use, with the surplus covering a portion of the demand at our main manufacturing building as well.
Mixing is among the most energy-intensive manufacturing processes at CRC. Putting the array on that roof means the compound in a part starts from generation on site rather than from the grid, and it holds that cost steady against the years of utility rate increases we expect from additional AI build-out in AI-friendly Pennsylvania.
The rest of the program
- ISO 14001:2015 certified environmental management system, audited to the same standard as our quality system
- Uncured scrap material recovered rather than landfilled
- Two buildings on one block, so a part is mixed, molded, bonded, and tested without freight between operations
- Domestic supply, which removes ocean freight from the footprint of every part we ship
Single-site manufacturing is an environmental argument as much as a lead-time one. A part that is compounded, molded, bonded, and tested on one block has no transport between those steps at all.




